- Final Design Submittal Cover Letter
- Exhibit A – Final Dam Removal Construction Plans, Technical Specifications, and Design Report
- Final Dam Removal Design Report
- Final Design Drawings
- Final Technical Specifications
- Exhibit B – Final Existing Conditions Assessment Report (See June 2022 version)
- Exhibit C – Final Dam Removal Erosion and Sediment Control Plans
- Appendix A – California Erosion and Sediment Control Drawings
- Appendix B – Oregon Erosion and Sediment Control Drawings
- Exhibit D – 60% Reservoir Restoration Construction Plans and Design Report
- 60% Restoration Design Summary Memo
- 60% Restoration Design Drawings
- Document 1 of 4
- Document 2 of 4
- Document 3 of 4
- Document 4 of 4
- Exhibit E – Quality Control Inspection Program (QCIP) (CEII)
- Exhibit F – Temporary Construction Surveillance and Monitoring Plan (CEII)
- Exhibit G – Preliminary Dam Removal Blasting Plan (Final plan to be submitted 60 days in advance of blasting activities)
- Exhibit H – Temporary Construction Emergency Action Plan (TEACP)
- Exhibit I – Project and Construction Schedule
- Exhibit J – Daggett Bridge Construction Drawings, Technical Specifications, and Design Report
- Daggett Bridge Design Documentation Report
- Daggett Bridge Construction Drawings
- Daggett Bridge Technical Specifications
- Exhibit K – City of Yreka Permanent Water Pipeline Relocation Construction Plans, Technical Specifications, and Design Report
- City of Yreka Waterline Design Documentation Report
- City of Yreka Waterline Construction Plans
- City of Yreka Waterline Technical Specifications
- Exhibit L – Fire Management Ramps and Dry Hydrants Construction Plans
- Exhibit M – Fall Creek Hatchery Construction Plans, Technical Specifications, and Design Report (See June 2022 version)
- Exhibit N – Public Safety Plan (January 2023)
- Exhibit O – Renewal Corporation Responses to Comments
- Exhibit P – Final Revision Log